Short answer
Start an industrial RFQ with the single-line diagram and motor/load list. Separate MV/LV distribution, MCC feeders and PLC controls, then define starting methods, fault duty, spare circuits and commissioning responsibilities. Suppliers can only make comparable offers when equipment and process-control boundaries are explicit.

Plan the package around factory loads and operating needs
A factory RFQ should connect incoming distribution with production loads and control requirements. Separate the main switchboards, motor circuits and process automation so each supplier prices the same scope.
- MV switchgear or RMU, transformer interfaces and LV main distribution.
- MCC feeders for pumps, fans, compressors and production equipment.
- PLC control cabinets, starter panels and communications defined by the process team.
Supply scope and interfaces
| Package item | Information to confirm | Boundary to agree |
|---|---|---|
| MV/LV distribution | SLD, transformer interfaces, ratings and feeder schedule | Identify transformer, cable and site-work responsibilities |
| MCC and starters | Motor duty, starting frequency and DOL/soft starter/VFD selection | Separate power feeders from process control and field equipment |
| PLC and automation | Control logic, I/O, HMI and communication interfaces | State whether programming, sensors and site commissioning are included |
Information to include in the RFQ
Related distribution equipment
Medium Voltage Switchgear
Incoming, metering, bus section and feeder panels with project-specific protection.
View productGCS Low Voltage Switchgear
Withdrawable LV distribution and motor-control sections with project-specific feeders.
View productControl Cabinets
PLC, motor starting, VFD and auxiliary control configurations for process loads.
View productHow to compare supplier quotations
Frequently asked questions
Sources and scope
This JCON ELEC procurement guide organizes equipment and interface questions for project review. JCON product pages describe available equipment families; external manufacturer material is technical background, not evidence of JCON authorization, certification or a complete plant offer. Final ratings, compliance and responsibilities require approved project documents and an agreed supply scope.