Short answer
Prepare a solar distribution RFQ from the inverter AC schedule and approved connection diagram. Confirm AC collection voltage, transformer and MV/RMU requirements, protection and the utility boundary. PV modules, DC combiners, inverters and grid approval are not automatically included in a switchgear quotation.

Define the AC path from inverter to connection point
Rooftop self-consumption and utility solar projects can require different electrical packages. Use the approved SLD to identify inverter AC feeders, collection boards, transformers and the utility connection boundary.
- AC collection and distribution at the specified inverter output voltage.
- Step-up transformer interfaces, RMU or MV feeder switchgear as required.
- Auxiliary power, metering, protection and plant-control communication interfaces.
Supply scope and interfaces
| Package item | Information to confirm | Boundary to agree |
|---|---|---|
| Inverter AC collection | Inverter voltage/current, feeder grouping and cable terminations | Distinguish AC collection equipment from DC combiners and PV arrays |
| Transformer and RMU/MV | Connection voltage, transformer ratio, capacity and protection | Confirm whether transformer and MV equipment form one supplied package |
| Generation and grid interfaces | Inverter data, metering, protection and plant-control requirements | Assign modules/inverters, grid studies, settings and utility approval |
Information to include in the RFQ
Related distribution equipment
Ring Main Unit (RMU)
Compact incoming and transformer feeder units with specified protection and accessories.
View productPrefabricated Substation
Coordinated MV, transformer and LV package boundaries for project review.
View productLow Voltage Switchgear
Main distribution, outgoing feeders and auxiliary power configured to the SLD.
View productHow to compare supplier quotations
Frequently asked questions
Sources and scope
This JCON ELEC procurement guide organizes equipment and interface questions for project review. JCON product pages describe available equipment families; external manufacturer material is technical background, not evidence of JCON authorization, certification or a complete plant offer. Final ratings, compliance and responsibilities require approved project documents and an agreed supply scope.
- JCON ELEC: related equipment
- JCON ELEC: technical and commercial proposal checklist