Short answer
First define the package boundary: complete MV-transformer-LV assembly, separately supplied equipment, or enclosure only. Transformer capacity alone cannot determine the quotation. Confirm system diagrams, equipment interfaces, heat dissipation, access, transport and site responsibilities together.

Quote one coordinated package with explicit interfaces
Identify who supplies each main item and who connects it. A transformer datasheet, enclosure drawing and LV feeder list should refer to the same project revision.
- Separate MV units, transformer, LV boards, enclosure and auxiliary systems in the schedule.
- Identify internal connections, earthing, control supply, lighting, heating and ventilation.
- Distinguish factory inspection from site installation and commissioning.
Substation quotation boundaries to distinguish
| Item | Complete-package review | Partial-supply review |
|---|---|---|
| Main equipment | List MV, transformer and LV configurations | Identify equipment supplied by other parties |
| Interfaces | Confirm internal connections and auxiliary systems | Allocate every electrical and mechanical interface |
| Site work | State foundation, unloading and commissioning exclusions | State who assembles, connects and tests on site |
Information to confirm
Related equipment
Prefabricated Substation
Coordinated MV, transformer and LV package boundaries for project review.
View productRing Main Unit (RMU)
Compact incoming and transformer feeder units with specified protection and accessories.
View productLow Voltage Switchgear
Main distribution, outgoing feeders and auxiliary power configured to the SLD.
View productCompare quotations on the same basis
Frequently asked questions
Sources and scope
JCON ELEC provides this checklist for package coordination. The IEC source describes prefabricated-substation scope; it is not a certificate for any pictured equipment. Final configuration and site suitability require project review.
Continue reading
- Medium Voltage Switchgear Selection Guide
- RMU vs Switchgear: Scope and Selection
- How to Prepare a Switchgear RFQ
- GCS Low Voltage Switchgear RFQ Checklist
- Switchgear Technical and Commercial Proposal Checklist
- Switchgear Export Packaging and Delivery Terms
- Global Switchgear Manufacturer Comparison: Buyer Checklist
Send your drawings and requirements
Share the available SLD, equipment list, project requirements and destination. Mark unresolved points so assumptions can be listed in the proposal.